BAVA
SubKit
Joseph Storey Plumbing
AI Automations
0%
1
About this bid
Saved clients
Select a saved client...
▼
Save client
Builder / company
Contact name
Builder phone
Builder email
Bid needed by
Project address
State
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
County
↑
Auto-fill from blueprint
Scan a residential plumbing plan
Drag & drop the original PDF blueprint here, or click to browse. PDF only — screenshots don't read accurately.
Browse files
2
Project basics
Project type
New construction
Addition
Remodel
Service call
Heated SF
Total SF (incl. unfinished)
Stories
1 story
1.5 stories
2 stories
3 stories
Foundation
Crawl space
Slab on grade
Full basement (walkout)
Apply multi-story premium (+$500 per additional story)
Apply basement labor add-on (+$4,000)
3
Bathroom & fixture schedule
Each full bath can be expanded to configure fixtures
Full baths (+$2,700 base — toilet + sink + shower)
−
0
+
Powder rooms (+$1,800 each — toilet + sink)
−
0
+
Laundry rooms (+$900 each)
−
0
+
4
Kitchen & wet areas
Kitchen
Kitchen sinks (+$900 each)
−
0
+
Garbage disposal (+$100)
Farmhouse sink (+$200)
Island / prep sink (+$200)
Dishwashers (+$900 each)
−
0
+
Fridge water line ($300)
Pot filler ($500)
Instant hot water dispenser ($600)
Coffee machine water line ($300)
Scullery / butler's pantry
Scullery sink
Bar / wet bar
Bar / wet bar sinks (+$900 each)
−
0
+
Laundry / utility
Mud room / utility sink ($900)
Mop sink ($900)
Laundry drain pan hookup ($300)
Unfinished areas
Unfinished kitchen — stub-outs only
5
Exterior fixtures
Hose bibs / spigots (+$300 each, +$450 frost-free)
−
0
+
Frost-free upgrade ($450 each instead of $300)
Outdoor kitchen sink ($1,200)
Outdoor shower ($1,200)
Pool house plumbing stub ($1,500)
Irrigation backflow preventer ($800)
Yard hydrant ($600)
6
Gas fixtures
Labor to connect gas lines to appliances
Gas range hookup ($400)
Gas fireplace hookup ($500)
Gas grill hookup ($400)
Generator gas hookup ($500)
Pool heater gas hookup ($600)
Tankless water heater gas hookup ($400)
Gas dryer hookup ($300)
7
Water heater & mechanical
Water heater type
Tankless gas — exterior ($1,400)
Tankless gas — interior ($1,900)
Tank gas ($1,400)
Tank electric ($1,200)
Units
−
0
+
Recirculation loop ($800)
Crossover loop ($800)
Expansion tank ($300)
Water treatment
Water softener loop ($600)
Whole-house filtration system ($1,200)
Reverse osmosis system ($900)
8
Drain, waste & vent
Big-project DWV items
Water service + sewer tie-in ($3,500)
Sewer ejector pump ($3,000)
Grinder pump ($3,500)
Sump pump ($1,200)
Cleanout install ($600)
Roof vent stack ($500)
Cast iron drop ($600)
9
Specialty & luxury
High-end and custom items
Dog wash station ($900)
Sauna plumbing ($1,200)
Wine room humidification water line ($1,200)
Water feature / fountain hookup ($900)
10
Modifiers
Phase pricing, minimums, and job-level adjustments
Bid phase
Rough-in phase only — prices at 60% of total (stub-out labor only)
Trim / finish phase only — prices at 40% of total (trim-out labor only)
Minimum job price
Minimum job price floor ($)
If the calculated total falls below this number, the estimate shows this minimum instead.
11
Plans & notes
Job notes on the left · blueprint markup on the right (mobile stacks)
Job notes
These notes get sent in the email. Markup annotations on the blueprint are for your reference only — not shared with the builder.
Blueprint markup
Upload a blueprint in the section at the top to enable markup.
Document type
Estimate
Invoice
Draft estimate
$0
Labor estimate · builder supplies all fixtures · updates as you fill out the form
Submits to builder via email
Submit Estimate →